Project: phowe   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1711.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Aug 13, 2021     Front Tailcone Top Skins - (4 hours)       Category: Fuselage
We matched drilled the forward top skins to the cage, window support, and number 4 bulkhead. During the match drilling of the top part the bulkhead moved. This caused the misalignment on the front and back top skins. On the back top skin, the holes are at the very edge of the skin and likely not to hold a rivet. We redrilled which created a second hole in the correct position. This was only 3 holes but we reached out to Rans to make sure this was not structural and just cosementic.


 